Practical Power Plant Engineering. Zark Bedalov. Читать онлайн. Newlib. NEWLIB.NET

Автор: Zark Bedalov
Издательство: John Wiley & Sons Limited
Серия:
Жанр произведения: Техническая литература
Год издания: 0
isbn: 9781119534990
Скачать книгу
The best source of data for the conductors is the old T&D Westinghouse handbook, from which we find the following data:

       HawkType: ACSR, 477 kcmilStranding: 26/7Ampacity: 660 AResistance: 0.135 Ω/kmInductive reactance: 0.24 Ω/kmCapacitive reactance: 0.188 Ω/km

      The Hawk line carrying capacity is well in excess of our plant requirements. Utilities like to build lines with sufficient capacity for future expansions. The maximum expected current from the plant at 230 kV is 100 A at 40 MVA. The line length from the plant to the local utility source of generation is estimated at 120 km.

       Calculate the line parameters in pu for the system studies:Now, calculate line characteristics in pu(2.1)

       Convert line characteristics (pu) from one MVA base to another:(2.2) (2.3)

       Convert line characteristics (Ω) from one system voltage kV base to another:(2.4) (2.5)

      The utility “informed” us that fault level at our plant bus, projected for the future with possible expansion is 10 kA at 230 kV. This is calculated approximately as: MVAsc = 4000 MVA.

      Therefore, we can now calculate the source impedance at our 230 kV bus as follows:

equation

      Or pu source impedance if kA fault interrupting current from the source (power utility) is given:

equation

      This source impedance will be used in our computer studies to represent the utility at our plant point of interface. It is a conservative value that will provide plenty of margin in our calculation.

      If we now calculate the fault MVAsc from the Utility on our selected MVAb base, it is:

equation

      Why 40 kA? This may sound too excessive for our requirements, but these are the ratings at the low end for the 230 kV equipment.

      The transformer differential protection scheme and metering would need current transformers (CTs) on the grid side of the HV breaker.

Photo of 230 kV breaker having interrupting capacity of at least 4000A. Diagrams of substations with double and single incomers for the same plant.

      The transformers in our 30/40 MVA plant will be required to share the plant load, but each will also be capable of carrying the full load of the plant on their ONAF cooling in case one transformer fails.

      Double power entry will be more reliable, though considerably more costly. A substation with two transformers, in addition to more HV switches will need three incoming HV circuit breakers to feed the two transformers. This substation will also require considerably more space.

      For a smaller plant of up to 10 MVA, a single HV incomer may be considered acceptable as the cost of the HV breakers and two transformers might be excessive in comparison with the cost of the plant. In fact, a single incomer switching yard may include nothing more than a single H frame pole structure.

      To support a smaller plant, several diesel generators (DGs) can be brought to site in trailers to temporarily replace a faulty transformer.

      This term is used in generation to determine the overall available MW capacity not considering one unit (single outage failure); therefore, a power plant with two units of 50 MW each has a firm capacity of one unit (50 MW). That is one generator unit out of two units, or two out of three units. Therefore, a firm capacity of a generating plant is the available generation MW capacity not counting one unit which is held as spare. Firm capacity of a transmission line is defined as one out of two circuits. A single circuit line has no firm capacity.

      Utilities use specific protective relays and have definite strategies for the line protection: two to three zone distance, negative sequence, etc. The utility will likely ask us to match the protection relaying at our end to that of their end and to coordinate the settings between the two ends. The line protection will likely be by pilot differential relaying with fiber optic communications.

      We can look at the historic data of the lightning days/year in the area. The plant may be in a desert environment with a low isokeraunic level or in some mountainous region of high lightning intensity. Hopefully, we can obtain this data from the utility and design the switchyard and the overhead lines accordingly with appropriate overhead shielding, grounding, and lightning arrester protection (see Chapter 10 for more details).

      Question?