charge for kilowatt‐hour consumed, the utility will likely have additional tariffs as demand charge, peak load, and reactive power hour consumption (MVARh consumption). The demand is the load averaged over a specified time (15 minutes, 30 minutes, or 1 hour) in kW or KVAR. The peak load may be the maximum instantaneous load or a maximum average load over a designated period of time. The reactive energy charge may be applicable for the load operating at <95% power factor at the point of interconnection (POI).

       Voltage operating range: For this plant, 69, 138, and 230 kV voltages can be used. In this case, 230 kV is available and preferred. We have to determine the percentage range of voltage oscillations received from the utility and how stable it is. The next thing is to decide if our plant will need an automatic on‐load tap changers (OnLTCs) on the main incoming power transformers, or simple off‐load tap changers (OffLTCs). See a typical transformer in Figure 2.4.

Image described by caption

      If the voltage swings are large, OffLTC changers may not be able to provide a manageable operating solution. They can regulate the plant voltage manually to a preselected percentage tap, while the OnLTCs manage the plant voltage automatically and linearly to the full tap range of ±10% on the primary winding.

      If OffLTCs are employed, the operator will have to shut down the plant in order to change the taps, if desired. Naturally, manual tap changes cannot be performed on a regular daily basis. Voltage at night may be higher than during the day. So once you set the taps, that is it. You may be forced to change the tap settings again if the operating conditions alter.

      Suppose, you have decided that your incoming transformers are to be rated 230 to 13.8 kV. Also, you were informed that the incoming voltage from the utility varies from 215 to 245 kV, but most likely toward the lower range (see Chapter 24 for more details on transformers).

       Transformer voltage: 230 to 13.8 kV

       Taps on primary side range: ±10% in 2.5% steps.

      Based on the aforementioned, a choice would be to operate the transformer with OffLTC at −2.5% taps for the primary voltage range of 215–245 kV. Negative taps on the transformer primary winding are the taps of choice used for boosting the plant 13.8 kV voltage. On the other hand, the OnLTC, if used, will maintain voltage relatively steady in smaller tap movements within the full tap range.

Grid voltage 215 kV 230 kV 245 kV
Taps set at:
−5.0% 13.54 14.48 15.42
−2.5% 12.98 14.14 15.05
0 12.89 13.8 14.69
+2.5% 12.57 13.45 14.32
+5.0% 12.25 13.10 13.95

      The plant voltage profile is not determined solely by the utility but also by the plant motor load. Plant reactive MVAR load will likely have to be partly drawn from the utility, as explained in Chapter 13.

      The smaller plant transformers, which distribute power to lower voltages, will generally have (±5%) OffLTC tap changers. Taps for each transformer will have to be set to obtain the most comfortable voltage profile throughout the plant during the normal plant operation and for large motor starting. This can be determined by a computer load flow study and confirmed during the plant operation. With the choice of OnLTC on our main transformers, we can consider that our plant distribution voltage will be relatively constant at 13.8 kV at all times, irrespective on what the utility throws at us.

      The typical voltage drop criteria to be considered in the design of the plant distribution system is <15% for large motor starting, and <3% for large motor while running.

      This is the system subtransient impedance Z″ representing the generating capacity of the utility at the POI. It also includes the impedance of the interconnecting transmission line. The source impedance is derived from the short‐circuit level at the plant as advised by the utility. The figure given will likely be based on a present and future generation planned by the utility. This value will be used as the base for determining the interrupting ratings of the plant circuit breakers that connect to the transmission line and the voltage regulation and capability of the plant large motors to start properly.

       The maximum source impedance (minimum fault level) when the utility is operating on light load with a minimum generating capacity connected to the grid. This source impedance will be used for voltage regulation calculations and large motor starting duty. If the supply network is weak (low short‐circuit level), soft, or variable frequency starting may be required for starting large motors in order to satisfy the utility flicker requirement and to minimize the impact on other nearby customers connected to the grid.

       The minimum source impedance (maximum fault level) is when the utility is operating on high load with maximum generating capacity. This impedance will be used to determine the short‐circuit interrupting duty of the plant circuit breakers.

      For our system studies and calculations, we will use MVAb = 30 MVA figure as our per unit MVA base. This is the base rating of our main incoming transformers: 30/40 MVA, 230 to 13.8 kV.

      We received the conductor (name) information from the utility. It will be a single Hawk ACSR (aluminum conductor steel reinforced) conductor. The overhead conductors are symbolically called by the names of birds. The data for the Hawk conductor can be obtained