The Battle for Khe Sanh. Moyers S. Shore. Читать онлайн. Newlib. NEWLIB.NET

Автор: Moyers S. Shore
Издательство: Bookwire
Серия:
Жанр произведения: Языкознание
Год издания: 0
isbn: 4057664619600
Скачать книгу
the 1st Battalion, 1st Marines (1/1) which, in April 1966, was participating in Operation VIRGINIA. In early October 1966, the 1st Battalion, 3d Marines, which was taking part in Operation PRAIRIE, moved into the base and the CIDG camp was relocated near Lang Vei, 9,000 meters to the southwest where it continued surveillance and counterinfiltration operations. The battalion remained at Khe Sanh with no significant contacts until February 1967 when it was replaced by a single company, E/2/9.[2] In mid-March 1967, Company E became engaged in a heavy action near Hill 861 and Company B, 1/9 moved in to reinforce. After a successful conclusion of the operation, E/2/9 returned to Phu Bai, and B/1/9 remained as the resident defense company.

map 3 khe sanh valley

      All these units sat astride the northwest-southeast axis of Route 9 and had the mission of denying the NVA a year-round route into eastern Quang Tri Province. The garrison at Khe Sanh and the adjacent outposts commanded the approaches from the west which led to Dong Ha and Quang Tri City. Had this strategic plateau not been in the hands of the Americans, the North Vietnamese would have had an unobstructed invasion route into the two northern provinces and could have outflanked the Allied forces holding the line south of the DMZ. At that time, the Americans did not possess the helicopter resources, troop strength, or logistical bases in this northern area to adopt a completely mobile type of defense. Therefore, the troops at the KSCB maintained a relatively static defense with emphasis on patrolling, artillery and air interdiction, and occasional reconnaissance in force operations to stifle infiltration through the Khe Sanh Plateau. In the event a major enemy threat developed, General Walt could rapidly reinforce the combat base by air.(7)

      On 20 April 1967, the combat assets at KSCB were passed to the operational control of the 3d Marines which had just commenced Operation PRAIRIE IV. The Khe Sanh area of operations was not included as a part of PRAIRIE IV but was the responsibility of the 3d Marines since that regiment was in the best position to oversee the base and reinforce if the need arose. The need arose very soon.(8)

      The job of stopping the NVA was given to Colonel John P. Lanigan and his 3d Marines. Although he probably did not know it when he arrived at Khe Sanh, this assignment would not be unlike one which 22 years before had earned him a Silver Star on Okinawa. Both involved pushing a fanatical enemy force off a hill.

map 4 the enemy plan

      On 25 April, the lead elements of the 3d Battalion, 3d Marines, commanded by Lieutenant Colonel Gary Wilder, arrived at Khe Sanh. The following day,⅔, commanded by Lieutenant Colonel Earl R. De Long, which was taking part in Operation BEACON STAR east of Quang Tri City was airlifted to the combat base. On the 27th, a fresh artillery battery, B/1/12, arrived and reinforced F/2/12; by the end of the day, the two units had been reorganized into an artillery group with one battery in direct support of each battalion.(10)

      Late in the afternoon of the 28th, the Marine infantrymen were ready to drive the enemy from the hill masses. These hills formed a near-perfect right triangle with Hill 881 North (N) at the apex and the other two at the base. Hill 861 was the closest to the combat base, some 5,000 meters northwest of the airstrip. Hill 881 South (S) was approximately 3,000 meters west of 861 and 2,000 meters south of 881N.

      The concept of operations entailed a two-battalion (⅔ and 3/3) assault for which Hill 861 was designated Objective 1; Hill 881S was Objective 2 and Hill 881N was Objective 3. From its position south of Hill 861,⅔ would assault and seize Objective 1 on 28 April. The 3d Battalion would follow in trace of ⅔ and, after the first objective was taken, 3/3 would wheel to the west, secure the terrain between Hills 861 and 881S, then assault Objective 2 from a northeasterly direction. Coordinated with the 3/3 attack,⅔ would consolidate its objective then move out toward Hill 881N to screen the right flank of the 3d Battalion and reinforce if necessary. When Objectives 1 and 2 were secured, 3/3 would move to the northwest and support ⅔ while it assaulted Objective 3. (See Map 5).

map 5 concept of operations during hill fights

      Marines of Company G, 2d Battalion, 3d Marines inch their way toward the summit of Hill 881N during the Hill fights. (USMC Photo A189161)

      Close air support strikes of the 1st Marine Aircraft Wing and massive artillery fires paved the way for infantry assaults. (USMC Photo A421953)

      After extremely heavy preparatory artillery fires and massive air strikes, the 3d Marines kicked off the attack. On the 28th,⅔ assaulted and seized Hill 861 in the face of sporadic resistance. Most of the enemy troops had been literally blown from their positions by heavy close air support strikes of the 1st Marine Aircraft Wing. The operation continued with a thrust against Hill 881S by 3/3. This area was the scene of extremely bitter fighting for several days, because, by this time, the NVA regiment which was originally slated for the attack on the airfield had been thrown into the hill battles in a vain effort to stop the Marines. After tons of artillery shells and aerial bombs had been employed against the hill, Lieutenant Colonel Wilder's battalion bulled its way to the summit and, on 2 May, secured the objective. In the meantime, Lieutenant Colonel De Long's battalion pushed along the ridgeline leading from Hill 861 to 881N. After smashing a determined NVA counterattack on 3 May, the 2d Battalion battered its way to the crest of Hill 881N and secured the