assessment is hazard identification. Hazard identification (HAZID), hazard and operability (HAZOP), safety integrity level (SIL), failure modes and effects analysis (FMEA), what‐if (WI), and safety checklist (SCL) are all examples of methodologies used worldwide.

      The next steps are:

       Risk estimation and ranking of risk

       Risk evaluation

       Implementation of risk reduction

      A risk reduction measures study should be carried out by a multi‐disciplinary brainstorming team with adequate experience, knowledge, and qualifications. The team will take each risk in turn and identify potential risk reduction measures, including any identified during the risk assessment.

      Although the elimination of danger is the ultimate goal, it cannot be easy and is not always possible. A hierarchical approach to risk reduction involves: hazard elimination (the most effective hazard control); hazard substitution (replacing something that produces a hazard (similar to removal) with something that does not create a hazard); engineering controls (these do not eliminate hazards, but rather isolate people from hazards); administrative controls (changes to the way people work.); and personal protective equipment.

      When discussing risk reduction and the hierarchy of risk control, it is essential to introduce the concept of the barrier. Barriers are functions and measures designed to break a specified undesirable chain of events. In other words, their function is to prevent a hazard from manifesting itself or mitigating its consequences.

      Both control and recovery barriers are elements of the bow tie methodology that will be discussed in depth. The Bow‐Tie method is a risk assessment method that can be used to analyze risk scenarios. It’s named after its shape and contains eight elements: hazard, top event, threats, consequences, preventive barriers, recovery barriers, escalation factors, and escalation factor barriers.

      Anyway, all the topics presented up to now will be discussed in detail later, including the concept of ALARP (which represents a critical element of risk management) and risk reduction in a “region of acceptability.”

       Luca Fiorentini

       Director, TECSA S.r.l.

      Risk, as per the ISO 31000 international standard, is defined as “effect of uncertainty on objectives,” where the “effect is a deviation from the expected”: risk is “usually expressed in terms of risk sources, potential events, their consequences and their likelihood.”

      When I first met the Bow‐Tie method many years ago I classified it as a simple, immediate, funny notation to describe simple situations. At that time I could refer to my experience in the industrial risk and process safety domains with HSE cases built with the use of multiple and combined methodologies (fault tree, event tree, HAZID/HAZOP/FMEA, etc.) up to full quantitative risk assessments based on calculations. So I started using Bow‐Ties to summarize the results coming from other methods, nothing more. Immediate (and coloured) notation of my Bow‐Ties started enriching my executive summaries, my papers, my conference slides, and so on with a great reward in terms of appreciation from readers, students, colleagues, and customers.

      Later I realized that I had discovered one of the main capabilities of the method: the clarity power of notation. It happened during the preparation of my Italian book on fire risk assessment, in which I described a number of methods (also risk matrices, structured brainstorming, LOPA, etc.) and I decided to describe with a Bow‐Tie diagram a couple of real incidents: the Buncefield tank fire in the UK (from a description given by the UK Health and Safety Executive in an official report) and the Thyssenkrupp fire in Italy that became very famous for the number of fatalities (seven) and in which I was part of the technical consultant group working on behalf of the Public Prosecutor’s Office since the beginning of the investigations. Both of the two incidents, described with a Bow‐Tie, raised the usual interest and curiosity in the readers, but I did understand that Bow‐Tie is the best way to deal with the essence of the various elements that define risk according to the ISO 31000 standard: hazard, deviation, threats, and consequences.

      Deviations are raised from threats and could lead to potential impacts in a very simple and straightforward path. This flow can be interrupted by barriers (or controls) that can modify the likelihood and or the severity of the consequences. Simple enough!

      These limitless possibilities of enrichment are offered even if we are guaranteed that the risk picture is visible and always available also to non‐technical parties, among them the stakeholders involved in risk‐based decisions. Focus should be given to barriers over time and this process can be referred to “risk management as all the coordinated activities to direct and control an organization with regard to risk,” whatever risk we should face to make decisions.

      This book gives the reader my idea of the Bow‐Tie method and barrier‐based risk management as one of the best tools to deal with current complexity with a structured and consistent approach that allows for value protection and creation inside organizations of all types and sizes facing internal and external factors, including human behaviour and cultural factors. The principles described with a Bow‐Tie diagram are those at the foundation of an effective and efficient risk management framework enabling an organization to deal with the effects of uncertainty on its objectives over time with a customized, integrated, yet dynamic approach based on the best available information. Complexity is increasing, day by day; let’s keep our Bow‐Ties simple and “smart.”

      First of all, I would like to express my thanks to Rosario Sicari, director of Chaos Consulting (www.chaosconsulting.it), with whom I share an important personal friendship as well as many professional interests, including accident investigation, forensic engineering and, especially, risk management with the barrier‐based methods shown in this volume. Rosario, with his impressive analytical skills combined with a broad knowledge of risk analysis methods and risk management principles, guarantees an important and constructive daily confrontation that allows, together with a communion of intent and in complete operational harmony, to operate successfully in support of clients for a consulting activity oriented to complexity management. With him I shared the adventure of this book on methodologies that are much appreciated by both of us, discovering a skilled technician, a patient detail curator and reviewer, and a determined critic. Of course, as I have in the past, I will enjoy